Skip to the content

Divercity: Distributed virtual workspace for enhancing communication and collaboration within the construction industry

Arayici, Y and Aouad, G 2004, Divercity: Distributed virtual workspace for enhancing communication and collaboration within the construction industry , in: European Conference on Product and Process Modelling in the Building and Construction Industry (ECPPM), , 8-10 September 2004, Istanbul, Turkey.

[img]
Preview
PDF - Accepted Version
Download (140kB) | Preview
    [img] Microsoft Word - Accepted Version
    Restricted to Repository staff only

    Download (359kB)

      Abstract

      DIVERCITY is a large EU funded project in the area of construction IT undertaken by a European consortium of researchers and practitioners from the construction industry. It is the acronym for Distributed Virtual Workspace for enhancing Communication within the Construction Industry and the prototype that presents the mechanism to smoothly and collaboratively conduct the construction projects from early briefing to the detailed design and even further by the end of the construction phase. To be precise, DIVERCITY aims to supply a shared virtual construction design and briefing environment that enables the construction industry to better undertake the client briefing and design review phases of a project. DIVERCITY comprises three main workspaces, which are client briefing, design review and construction workspaces respectively. Whilst the Client Briefing workspace enables architect to interact and communicate with client for capturing client needs, the design review workspace allows design team to review the design solution in different respects such as lighting, acoustic and thermal conditions and the construction workspace helps the planner evaluate optimum buildability for a building through communication with other parties of the design team and site planning and management. The paper presents the DIVERCITY system and its main six components: Client Briefing, Lighting, Acoustic, Thermal and Heating Simulations, Visual Product Chronology for construction planning, lastly Site planning & Analysis, how each of them handles different aspects of a construction project in a construction supply chain and how they complement each others to constitute a seamless integrated computer environment for the sake of excellence of briefing and design and construction planning.

      Item Type: Conference or Workshop Item (Paper)
      Themes: Subjects / Themes > Q Science > Q Science (General)
      Subjects / Themes > T Technology > T Technology (General)
      Subjects outside of the University Themes
      Schools: Colleges and Schools > College of Science & Technology
      Colleges and Schools > College of Science & Technology > School of the Built Environment
      Colleges and Schools > College of Science & Technology > School of the Built Environment > Centre for Information Technology in Construction
      Colleges and Schools > College of Science & Technology > School of the Built Environment > Salford Centre for Research & Innovation (SCRI)
      Refereed: Yes
      Depositing User: Y Arayici
      Date Deposited: 03 Dec 2010 11:16
      Last Modified: 20 Aug 2013 17:42
      URI: http://usir.salford.ac.uk/id/eprint/12422

      Actions (login required)

      Edit record (repository staff only)

      No Altmetrics available

      Downloads per month over past year

      View more statistics