The development of a conceptual framework on activity-based cost controlling for better management of project overheads during the construction stage
Jaya, N, Pathirage, CP and Sutrisna, M 2010, The development of a conceptual framework on activity-based cost controlling for better management of project overheads during the construction stage , in: TIIMI 2010 International Scientific Conference, 3th-5th December 2010, London, United Kingdom.
This is the latest version of this item.
Abstract
The conceptual framework of the research is investigated and established on the 'Activity-Based Cost Controlling (ABCC) model for better management of project overheads to increase profit during the construction stage in the construction industry', based on project requirement for cost controlling practices on monitoring the status of project: updating project expenses and managing changes to cost planning. This conceptual model develops deductively through a thorough reviewing the literature’ for a critical preposition and corroborating further research. It is created a comprehensive model on project cost controlling and management of project overheads, namely the ABCC model.
| Item Type: | Conference or Workshop Item (Paper) |
|---|---|
| Uncontrolled Keywords: | activity-based costing, cost controlling, project overheads, construction stage, construction industry |
| Themes: | Subjects / Themes > T Technology Subjects / Themes > T Technology > TH Building construction Built and Human Environment |
| Schools: | Colleges and Schools > College of Science & Technology Colleges and Schools > College of Science & Technology > School of the Built Environment Colleges and Schools > College of Science & Technology > School of the Built Environment > Centre for Disaster Resilience Colleges and Schools > College of Science & Technology > School of the Built Environment > Management in Construction Research Centre (MIC) |
| Refereed: | Yes |
| Depositing User: | Nyoman M Jaya |
| Date Deposited: | 07 Apr 2011 10:51 |
| Last Modified: | 27 Sep 2011 11:57 |
| URI: | http://usir.salford.ac.uk/id/eprint/13004 |
Available Versions of this Item
- The development of a conceptual framework on activity-based cost controlling for better management of project overheads during the construction stage. (deposited 14 Dec 2010 10:23)
- The development of a conceptual framework on activity-based cost controlling for better management of project overheads during the construction stage. (deposited 07 Apr 2011 10:51)[Currently Displayed]
Actions (login required)
| Edit record (repository staff only) |

Tools
Tools