Skip to the content

A model of multiple nested inspections at different intervals

2000, 'A model of multiple nested inspections at different intervals' , Computers and Operations Research, 27 , pp. 539-558.

Full text not available from this repository.

Abstract

Although much has been published concerning the optimality of a single-type inspection process, relatively little attention has been paid in the literature of maintenance modelling to the practice of multiple nested inspections. In this paper a novel model addressing multiple nested inspections of production plant at di!erent intervals is established based upon the delay time concept. A branch-and-bound algorithm is developed for "nding the optimal intervals for all the inspections which minimizes the long-term expected total cost per unit time. The modelling can be readily extended to model downtime or reliability. Necessary mathematics is presented and proofs are given. A numerical example is also given to illustrate the modelling and solution processes.

Item Type: Article
Uncontrolled Keywords: Inspection; Delay time; Optimization; Algorithm
Journal or Publication Title: Computers and Operations Research
Publisher: Elsevier
Refereed: Yes
ISSN: 0305-0548
Depositing User: Users 8543 not found.
Date Deposited: 24 Nov 2009 09:45
Last Modified: 20 Aug 2013 16:01
URI: http://usir.eprints.org/id/eprint/2542

Actions (login required)

Edit record (repository staff only) Edit record (repository staff only)