Number of items: 53.
Article
Machado, M, Underwood, J ORCID: https://orcid.org/0000-0002-3193-1620 and Fleming, AJ ORCID: https://orcid.org/0000-0002-2660-6524
2016,
'Implementing BIM to streamline a design, manufacture, and fitting workflow : a case study on a fit-out SME in the UK'
, International Journal of 3-D Information Modeling, 5 (3)
, pp. 31-46.
|
|
Ozmen, ES, Oner, MA, Khosrowshahi, F and Underwood, J ORCID: https://orcid.org/0000-0002-3193-1620
2014,
'SMEs' purchasing habits : A procurement maturity model for stakeholders'
, SAGE Open, 4 (2)
, pp. 1-19.
|
![[img]](/35160/8.hassmallThumbnailVersion/2158244014536405.pdf)  Preview |
|
Ozmen, ES, Oner, MA, Khosrowshahi, F and Underwood, J ORCID: https://orcid.org/0000-0002-3193-1620
2013,
'SME buying behaviour : Literature review and an application agenda'
, The Marketing Review, 13 (2)
, pp. 207-227.
|
|
Isikdag, U, Underwood, J ORCID: https://orcid.org/0000-0002-3193-1620, Kuruoglu, M, Goulding, JS and Acikalin, U
2009,
'Construction informatics in Turkey: strategic role of ICT and future research directions'
, Journal of Information Technology in Construction, 14
, pp. 412-428.
|
![[img]](/style/images/fileicons/application_pdf.png)  Preview |
|
Isikdag, U, Underwood, J ORCID: https://orcid.org/0000-0002-3193-1620, Aouad, GF and Trodd, N
2007,
'Investigating the role of building information models as a part of an integrated data layer: A fire response management case'
, Architectural Engineering and Design Management, 3 (2)
, pp. 124-142.
Item not available from this repository.
|
|
Sarshar, M, Tanyer, AM, Aouad, GF and Underwood, J ORCID: https://orcid.org/0000-0002-3193-1620
2002,
'A Vision for Construction IT 2005-2010: Two Case Studies.'
, Engineering Construction and Architectural Management, 9 (2)
, pp. 152-160.
Item not available from this repository.
|
|
Book Section
Underwood, J ORCID: https://orcid.org/0000-0002-3193-1620, Shelbourn, M ORCID: https://orcid.org/0000-0002-2995-3003, Carlton, D, Zhao, G, Simpson, M, Aksenova, G ORCID: https://orcid.org/0000-0002-3261-0917 and Mollasalehi, S
2021,
'Transforming the productivity of people in the built environment : emergence of a digital competency management ecosystem'
, in:
Handbook of Research on Driving Transformational Change in the Digital Built Environment
, Advances in Civil and Industrial Engineering (ACIE)
, IGI Global, pp. 430-466.
|
![[img]](/60398/1.hassmallThumbnailVersion/Underwood%20chapter%2017.pdf)  Preview |
|
Underwood, J ORCID: https://orcid.org/0000-0002-3193-1620, Shelbourn, M ORCID: https://orcid.org/0000-0002-2995-3003, Fleming, AJ ORCID: https://orcid.org/0000-0002-2660-6524, Heywood, J and Roberts, I
2018,
'Streamlining a design, manufacture, and fitting workflow within a UK fit-out SME : a BIM implementation case study'
, in:
Contemporary Strategies and Approaches in 3-D Information Modeling
, IGI-Global, pp. 242-266.
|
|
Isikdag, U, Underwood, J ORCID: https://orcid.org/0000-0002-3193-1620, Kuruoglu, M and Abdul-Rahman, A
2009,
'Geospatial views for RESTful BIM'
, in:
Handbook of research on building information modeling and construction informatics: concepts and technologies
, IGI-Global, New York, pp. 473-482.
|
|
Monograph
Underwood, J ORCID: https://orcid.org/0000-0002-3193-1620, Ayoade, OA, Khosrowshahi, F, Greenwood, D, Pittard, S and Garvey, R
2015,
Current position and associated challenges of BIM education in UK higher education
, Project Report,
BIM Academic Forum.
|
|
Underwood, J ORCID: https://orcid.org/0000-0002-3193-1620, Khosrowshahi, F, Pittard, S, Greenwood, D and Platts, T
2013,
Embedding Building Information Modelling (BIM) within the taught curriculum : Supporting BIM implementation and adoption through the development of learning outcomes within the UK academic context for built environment programmes
, Project Report,
Higher Education Academy (HEA), York.
|
|
Conference or Workshop Item
Mollasalehi, S, Aboumoemen, AA, Rathnayake, A, Fleming, AJ ORCID: https://orcid.org/0000-0002-2660-6524 and Underwood, J ORCID: https://orcid.org/0000-0002-3193-1620
2018,
Development of an integrated BIM and lean maturity model
, in: 26th Annual Conference of the International Group for Lean Construction, 18-20 July 2018, Chennai, India.
|
![[img]](/50766/1.hassmallThumbnailVersion/Mollasalehi%20et%20al.%20%202018%20-%20Development%20of%20an%20Integrated%20BIM%20and%20Lean%20Maturity%20Model.pdf)  Preview |
|
Mollasalehi, S, Arachchi Rathnayake Mudiyanselage, AP, Abou Moemen, AA, Underwood, J ORCID: https://orcid.org/0000-0002-3193-1620, Fleming, AJ ORCID: https://orcid.org/0000-0002-2660-6524, Kulatunga, U and Coates, SP ORCID: https://orcid.org/0000-0002-5437-1777
2017,
How BIM-lean integration enhances the information management process in the construction design
, in: 25th Annual Conference of the International Group for Lean Construction, July 2017, Heraklion, Greece.
|
|
Mollasalehi, S, Fleming, AJ ORCID: https://orcid.org/0000-0002-2660-6524, Talebi, A and Underwood, J ORCID: https://orcid.org/0000-0002-3193-1620
2016,
Development of an experimental waste framework based on BIM/lean concept in construction design
, in: 24th Annual Conference of the International Group for Lean Construction, 18th to 24th July 2016, Boston, MA, USA.
|
![[img]](/43968/1.hassmallThumbnailVersion/Mollasalehi%20et%20al.%20%202016%20-%20Development%20of%20an%20Experimental%20Waste%20Framework%20Based%20on%20Bim-Lean%20Concept%20in%20Construction%20Design.pdf)  Preview |
|
Machado, M, Underwood, J ORCID: https://orcid.org/0000-0002-3193-1620 and Fleming, AJ ORCID: https://orcid.org/0000-0002-2660-6524
2015,
Implementing BIM to Streamline a Design, Manufacture and Fitting Workflow.
, in: Modular and Offsite Construction [MOC] Summit, May 19-21 2015, Edmonton, Alberta, Canada.
|
![[img]](/38521/1.hassmallThumbnailVersion/machado_underwood_fleming_poster_moc_2015.pdf)  Preview |
|
Bassanino, MN, Underwood, J ORCID: https://orcid.org/0000-0002-3193-1620, Allen, T, Khosrowshahi, F and Stokes, E
2008,
Towards developing an industry led educational framework using LEAN approach
, in: 16th Annual Conference of the International Group for Lean Construction, 16th-18th July 2008, Manchester, UK.
|
![[img]](/style/images/fileicons/application_pdf.png)  Preview |
|
Underwood, J ORCID: https://orcid.org/0000-0002-3193-1620, Aouad, GF, Isikdag, U and Trodd, NM
2007,
Investigating the applicability of IFC in geospatial environment in order to facilitate the fire response management process
, in: 24th CIB-W78 Conference: Bringing ICT Knowledge to Work, 26-29 June 2007, Maribor, Slovenia.
|
![[img]](/style/images/fileicons/application_pdf.png)  Preview |
|
Book
Ahmed, V, Egbu, CO, Underwood, J ORCID: https://orcid.org/0000-0002-3193-1620, Lee, A ORCID: https://orcid.org/0000-0003-0769-5215 and Chynoweth, P, (eds.)
2013,
IPGRC 2013: International post graduate research conference
, University of Salford, Salford.
|
![[img]](/style/images/fileicons/application_pdf.png)  Preview |
|
Thesis
Other
This list was generated on Tue May 24 01:05:41 2022 UTC.